New Zealand, Part II – Orams Shipyard, Auckland

New Zealand, Part II – Orams Shipyard, Auckland

As the saying goes, despite “the best plan of mice and men”, yachts frequently have a tendency to unearth the unknown.

With Seahawk hauled out and safely choked on the hard, the next step was the disassembly of the boat for the painters, as well as the opening of sealed spaces and closed machinery for inspection by the ABS surveyor. 

The process of a refit is often a voyage of discovery, and it can generate a range of new issues previously hidden from view. While experience is valuable in pre-empting these additional tasks, there’s sometimes the risk of finding new surprises.

Seahawk followed this mantra and gave us a few curved balls. The most significant one was the need to replace both stern tubes of the boat. These are pipes that run between the aft wall of the engine room to the hull, with the propellor shaft spinning inside it. These tubes are constantly full of seawater, which is highly destructive. This area of the boat is prone to gradual corrosion failure. In Seahawk’s case, there had been a rapid corrosion process taking place since some stainless steel sleeves had been fitted into the tubes at some stage for an unknown reason.

This presented a major new project for the yard with several hurdles, starting with the acquisition of the specific grade of aluminium required, and its paper trail of material approval for ABS. As it turns out, 5083-grade aluminium in 300mm thickness is a rare beast. We scoured the world to find enough for the job. Eventually, a dealer in Holland had some that could be acceptable.

The other major hurdle to this job was accessing the area for work; the boat’s main electrical distribution panel is directly above the starboard side stern tube, meaning that the vessel would have to go dead ship for the duration of the work, and the hundreds of cables meticulously disconnected and then reconnected following the extensive welding work that would be required; this electrical job represented more labor time than the metalwork itself.

Unfortunately, a job like this comes with penalties beyond just the unexpected costs associated with the extra work; Carrying out welding work on the hull must be in accordance with fire safety requirements, and it’s, of course, messy. Performing paintwork on the boat requires the use of solvents that are explosive, as well as clean room conditions, creating a major conflict between these two tasks, making scheduling a real headache for the management team, and inevitably delaying the completion of the overall project.

The other ugly feature of working on boats, especially aluminium ones, is corrosion in general. Steel boats “rust”; composite boats get “osmosis”; and aluminium boats suffer electrolytic corrosion, which is caused when two different metals have a continuous current in between them, as they are in contact with an electrolyte substance. Aluminium vessels are often referred to as “Alker Selzer boats”, as they essentially ‘fizz’ like the pills do when in seawater.

When performing a re-paint, dealing with corroded areas is always an add-on to the project, as it’s simply not possible to gauge the amount of corrosion until the painters start digging into the job. Yacht paint is not just a thin coat of color over the surface; The full job requires special primers applied to the bare surface, followed by several layers of a fairing compound that are used to create a smooth shape before a final primer. In Seahawk’s case, there’s also a metallic paint finish; a base color coat followed by layers of clear coat. In the event of corrosion of the metal substrate, all these layers have to be rebuilt and perfectly blended with the existing sound materials. This is time-consuming and tends to be an expanding job. Seahawk’s paint is 9 years old and was hiding a lot of corrosion under some particularly thick areas of the fairing, adding a great deal of time to the overall paint project and expected completion date of the boat.

These major developments, along with other smaller but nonetheless significant discoveries, pushed the duration of our refit from an estimated 6-month project out to a solid 9 months.

At this stage, the vessel is a “War Zone”, a daunting sight with so much taking place simultaneously and so much “destruction” to access the projects themselves.

As of now, Seahawk is being taken care of in Orams Marine and will be back in the water in June 2023. An exciting itinerary follows as we will continue to explore the South Pacific.

The following video, made by Righardt (dive instructor & videographer on board), captures some of our day-to-day experience in the shipyard. Enjoy!

New Zealand, Part I – Orams Shipyard, Auckland

New Zealand, Part I – Orams Shipyard, Auckland

Seahawk’s first journey of the Pacific Ocean came to an end in September 2022, after 9 months of cruising the waters of French Polynesia and Fiji.

Arriving in the city of Auckland was new for most of us on board. The cold, rainy weather of the New Zealand winter and the big city lights painted a scenario very different from the one we had gotten used to, in the tranquility and warmth of our previous destinations.

Seahawk’s prime purpose for her visit to Auckland is the run-up to her 10-year anniversary and ABS class certificate renewal. ABS (American Bureau of Shipping) is one of a number of globally recognized Class Societies, and it ensures that the vessel condition meets a long list of standards, that repairs are carried out correctly, and it ultimately certifies to the flag state that the vessel is materially seaworthy and unlikely to cause pollution or other dangers in operation. The boat’s class certificate lasts 5 years (subject to annual inspections). At renewal, the vessel undergoes a detailed and fairly invasive survey inside and out to check the condition of parts that are not normally accessible.

Amongst many other things, the survey includes: measuring the thickness of the hull, an overhaul of the main machinery (to a level depending on the total running hours usually), an inspection of all hull valves that keep the water out, and a thorough inspection of the shaft line.

As a 10-year survey involves extended time out of the water, it is usual to carry out an overall refit of the vessel at the same time. In Seahawk’s case, this meant a full repaint, and the opportunity to remove and overhaul the mast and rigging, which must also be carried out on a similar periodic basis. This project was a major event and would be expected to take a minimum of 6 months to complete, considering no eventualities or last-minute surprises.

The planning began a year in advance. After considering several options, Auckland seemed like the best overall fit for our intended movements and the availability of suitable facilities. Orams Marine was our selected shipyard, and a plan was drawn up to bring the project together.

So come September and there we were, in the City of Sails, ready to get to work. But first things first, masts and rigging had to be removed, and the boat had to come out of the water.

Pulling a Panamax rig from a yacht is no mean feat. The task requires the largest mobile cranes available, and a well-thought-out plan to lift the mast and lay it down on the ground; The combined area the masts need while assembled is around the size of a football pitch. The responsibility for this part of the project was taken by Dave White, of World Spar Services, and assisted by the team at RigPro in Auckland.

The rig pull ended up going by the numbers and was completed in one day. Then, the massive disassembly of the two spars followed to reduce their footprint as quickly as possible.

Shortly after, Seahawk got removed from the water. In the last 3 years, she has been hauled 3 times, each time by a different method. In Italy, she was dry-docked; in Mexico, a Synchro lift was used, and now it was the turn of an 820T travel lift to do the job. Again, the job went smoothly and the boat ended up securely blocked in the corner of Orams’ hardstand area ready for scaffolding and tenting.

And now, the real work begins.

If you would like to know more, dive instructor and videographer Righardt made the following videos to document the process. Enjoy!